Deck Permit in Draper, Utah
Required for construction of new decks or significant modification of existing decks in Draper. Decks over 30 inches above grade require a building permit.
Verified 2026-06-27 · Source
When you need this permit
- Deck height over 30 inches above adjacent grade
- Any deck attached to the dwelling
- Deck area exceeding 200 square feet
Required documents
- Req
Site Plan
Showing deck location relative to property lines and setbacks
- Req
Construction Plans
Deck framing plan with post, beam, and joist details
- Req
Ledger Detail
Connection detail for decks attached to the house
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | Based on ICC valuation table | — |
| Plan Review | 65% of building permit fee | — |
Review timeline
5–10 business days
Typical plan review in Draper
Inspection process
- 1
Footing
Post footings before concrete pour
- 2
Framing
All framing, connections, and ledger attachment complete
- 3
Final
Railings, stairs, and all work complete
Tips
- Draper has hillside overlay zones — check if your property has additional setback or height restrictions for decks.
- Decks less than 30 inches above grade and not attached to the dwelling may be exempt — verify with the Building Division.
- Ensure ledger connections use approved flashing and fasteners per IRC requirements.
Frequently asked questions
- Do I need a permit to build a deck in Draper?
- Yes, if the deck is over 30 inches above grade, attached to the dwelling, or exceeds 200 square feet. Contact Draper's Building Division at (801) 576-6500 to confirm whether your project requires a permit.
- How long does deck permit review take in Draper?
- Deck permit review in Draper typically takes 5-10 business days, faster than a full residential permit due to the simpler scope.