Residential Building Permit in Herriman, Utah

Required for new residential construction, additions, and structural alterations in Herriman.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Plan Review65% of building permit fee
Building Permit$0.25 per sq ft + valuation-based per ICC table
Utility ConnectionVaries by connection type

Review timeline

1021 business days

Typical plan review in Herriman

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How much does a residential building permit cost in Herriman?
Herriman charges $0.25 per square foot plus a valuation-based fee calculated from the ICC building valuation table. Plan review is an additional 65% of the permit fee.
How long does permit review take in Herriman?
Residential plan review typically takes 10-21 business days in Herriman. Digital submissions through the city portal may be processed faster.