Accessory Structure Permit in Millcreek, Utah

Required for construction of detached garages, sheds over 200 square feet, workshops, and other accessory structures in Millcreek.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building PermitBased on ICC valuation table
Plan Review65% of permit fee

Review timeline

714 business days

Typical plan review in Millcreek

Inspection process

  1. 1

    Foundation

    Footing and foundation before concrete pour

  2. 2

    Framing

    Framing, sheathing, and roof structure

  3. 3

    Final

    Structure complete, all systems operational

Tips

Frequently asked questions

Do I need a permit for a shed in Millcreek?
In Millcreek, sheds over 200 square feet require a building permit. Sheds 200 square feet or smaller are generally exempt from a building permit but must still comply with zoning setback requirements.
How close to the property line can I build an accessory structure in Millcreek?
Setback requirements for accessory structures in Millcreek vary by zone. Contact the Building Department at (801) 214-2700 to confirm the setback requirements for your specific property.