Residential Building Permit in Millcreek, Utah
Required for new residential construction, additions, and structural alterations in Millcreek.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Two sets of construction drawings to scale
- Req
Site Plan
Property survey showing setbacks and footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review | 65% of building permit fee | — |
| Building Permit | Based on ICC valuation table | — |
| Utility Connection | Varies by connection type | — |
Review timeline
10–21 business days
Typical plan review in Millcreek
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Millcreek accepts permit applications and inspection requests online through the Contractor Portal.
- Inspection requests must be received by 3:00 PM on the business day prior to the requested inspection date.
- Millcreek was incorporated in 2016 — some older properties may reference Salt Lake County building records.
Frequently asked questions
- How much does a residential building permit cost in Millcreek?
- Millcreek calculates building permit fees using the ICC building valuation table. Plan review is an additional 65% of the permit fee. Contact Building Services at (801) 214-2700 for a specific estimate.
- How long does permit review take in Millcreek?
- Residential plan review in Millcreek typically takes 10-21 business days. Online submissions through the Contractor Portal may process faster.