Residential Building Permit in Sandy, Utah

Required for new residential construction, additions, and structural alterations in Sandy.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Plan Review65% of building permit fee
Building PermitBased on project valuation per ICC table
Utility ConnectionVaries by connection type

Review timeline

1021 business days

Typical plan review in Sandy

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How do I apply for a residential building permit in Sandy?
Sandy City uses a paperless permit system. Submit your application and plans digitally through the Sandy Cityworks portal at sandy.utah.gov. Contact (801) 568-7100 for assistance.
How long does permit review take in Sandy?
Residential plan review typically takes 10-21 business days in Sandy. Digital submissions through the paperless system help streamline the process.