Residential Building Permit in Taylorsville, Utah

Required for new residential construction, additions, and structural alterations in Taylorsville.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Plan Review65% of building permit fee
Building PermitBased on ICC valuation table
Utility ConnectionVaries by connection type

Review timeline

1021 business days

Typical plan review in Taylorsville

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How much does a residential building permit cost in Taylorsville?
Taylorsville calculates building permit fees using the ICC building valuation table based on project type and value. Plan review is an additional 65% of the permit fee. Call (801) 955-2030 for a project-specific estimate.
How long does permit review take in Taylorsville?
Residential plan review in Taylorsville typically takes 10-21 business days. Contact the Building Department for current turnaround times.