Residential Building Permit in West Jordan, Utah
Required for new residential construction, additions, and structural alterations in West Jordan.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Two sets of construction drawings to scale
- Req
Site Plan
Property survey showing setbacks and building footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review | 65% of building permit fee | — |
| Building Permit | Based on project valuation per ICC table | — |
| Utility Connection | Varies by connection type | — |
Review timeline
10–21 business days
Typical plan review in West Jordan
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- West Jordan accepts online permit applications through their permit portal.
- Email applications to wjbuildingpermits@westjordan.utah.gov as an alternative to online submission.
- Schedule inspections at least 24 hours in advance.
Frequently asked questions
- How do I apply for a residential building permit in West Jordan?
- West Jordan accepts building permit applications online through their Public Portal or via email to wjbuildingpermits@westjordan.utah.gov. You can also apply in person at 8000 S Redwood Rd.
- How long does permit review take in West Jordan?
- Residential plan review typically takes 10-21 business days in West Jordan. Online submissions may be processed faster than paper applications.