Residential Building Permit in Orem, Utah
Required for new residential construction, additions, and structural alterations in Orem.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Two sets of construction drawings to scale
- Req
Site Plan
Property survey showing setbacks and building footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review | 65% of building permit fee | — |
| Building Permit | Based on project valuation per ICC table | — |
| Utility Connection | Varies by connection type | — |
Review timeline
10–21 business days
Typical plan review in Orem
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Orem requires full online submittal for building permits through their Development Services portal.
- Schedule inspections by calling (801) 229-7198.
- All plans must be submitted digitally — paper submissions are not accepted.
Frequently asked questions
- How do I apply for a residential building permit in Orem?
- Orem requires all building permit applications to be submitted online through their Development Services portal. Paper submissions are not accepted. Contact (801) 229-7060 for assistance.
- How long does permit review take in Orem?
- Residential plan review typically takes 10-21 business days in Orem. Digital-only submission helps streamline the review process.