Residential Building Permit in St. George, Utah

Required for new residential construction, additions, and structural alterations in St. George.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Plan Review65% of building permit fee
Building PermitBased on ICC valuation table
Utility ConnectionVaries by connection type

Review timeline

1021 business days

Typical plan review in St. George

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How much does a residential building permit cost in St. George?
St. George calculates building permit fees using the ICC building valuation table based on project scope and value. Plan review is an additional 65% of the permit fee. Contact the building department at (435) 627-4120 for a specific estimate.
How long does permit review take in St. George?
Residential plan review in St. George typically takes 10-21 business days. Electronic submissions through the CityInspect portal may be processed faster than paper applications.