Residential Building Permit in Provo, Utah
Required for new residential construction, additions, and structural alterations in Provo.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Two sets of construction drawings to scale
- Req
Site Plan
Property survey showing setbacks and building footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review | 65% of building permit fee | — |
| Building Permit | Based on project valuation per ICC table | — |
| Utility Connection | Varies by connection type | — |
Review timeline
10–21 business days
Typical plan review in Provo
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Provo accepts online permit applications through their portal at provo.gov.
- Building permits are issued until 5:30 PM — arrive early.
- Schedule inspections at least 24 hours in advance.
Frequently asked questions
- How do I apply for a residential building permit in Provo?
- Provo accepts building permit applications online through the Provo Online Portal or in person at 445 W Center St, Suite 200. Contact the Building Division at (801) 852-6428 for assistance.
- How long does permit review take in Provo?
- Residential plan review typically takes 10-21 business days in Provo. Online submissions through the city portal may be processed faster.
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.